|
| Image | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | |
|
| Looking down from the penthouse, a 15,000 lb package boiler that the apprentice was required to rig with a crane, spin 90 degrees, land it on rollers, set up one of the tuggers to pull it into the boiler house, reeve up five parts of line to work with one that is set up, and lift the boiler into place. | |
| 11 Images | Generated by JAlbum 6.5 & Chameleon skin | HELP? | |